Proper installation ensures years of trouble-free enjoyment. Our team will guide you through every step of the process.
Installation Process
Site Preparation: Ensure your installation site has a level, solid foundation. We recommend a reinforced concrete pad or properly constructed deck.
Electrical Setup: Most hot tubs and swim spas require 220V electrical service. A licensed electrician should install a dedicated circuit per local codes.
Delivery Day: Our professional delivery team will carefully place your spa in the prepared location using specialized equipment.
Final Connection: Your electrician completes the final hookup. Our team will provide a full orientation on operating your new spa.
Site Requirements
Foundation Requirements
Level surface within 1/4 inch
Concrete pad: minimum 4 inches thick, reinforced
Deck: properly engineered to support full weight
Gravel base: compacted and level (hot tubs only)
Electrical Requirements
220V/240V dedicated circuit (most models)
50–60 amp service depending on model
GFCI protection required
Licensed electrician installation required
Access Requirements
Minimum 36-inch access path
Gate or fence removal may be needed
Clear overhead clearance
Frequently Asked Questions
How long does installation take?
Delivery and placement typically takes 1–2 hours depending on site access. Your electrician's work may take an additional few hours.
Do I need a permit?
Electrical permits are typically required. Some areas may also require permits for the spa itself or deck construction. Check with your local building department.
Can the spa go indoors?
Yes, with proper ventilation and drainage. Indoor installations have additional requirements. Our team can advise on indoor installation considerations.
What if my yard has limited access?
We handle challenging installations regularly. Crane services are available when needed. Our delivery team will assess access during the planning process.